by Administrator | Nov 28, 2021 | Case Study
From 2016 residents were ‘verbally’ told that plans were underway for a new facility with apartments and care and that once this was built that they would likely be demolishing the old poorly insulated cottages. Over the next 5 years they were given multiple verbal...
by Administrator | Sep 1, 2021 | Case Study
A village was upgrading its community facilities. This included a large hall, small hall and proposed shared kitchen and toilet facilities. Plans were drawn up and presented to the residents. While 2 toilets were included off the main hall, the new design lacked a...
by Administrator | Sep 1, 2021 | Case Study
What do you do if you’re promised something by the operator for 5 years, only to have it withdrawn by them in less than 5 weeks? That was the situation a few residents found themselves in last month. This story involves an old Christchurch village with 22 independent...
by Administrator | Sep 1, 2021 | Case Study
Residents in a South Canterbury village are finding out, firsthand, the futility of the current legislation to fix the systemic failure of poorly designed villages. Nearly two dozen accidents have occurred at this village due to the poor construction of roading, kerbs...